ITAC Assessment: SU0275
ITAC logo
ITAC Assessment: SU0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Rolled Aluminum
NAICS 331315: Aluminum Sheet, Plate, and Foil Manufacturing
SIC 3353: Aluminum Sheet, Plate, and Foil
Sales Range greater than $500
M
# of Employees 675
Plant Area 1,611,720
ft2
Annual Production 1,300,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,308,952 261,939,779
kWh
Electricity Fees $216,000 -
Natural Gas $34,714,592 3,014,433
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $424,655 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $398,662

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $97,827 - $97,827
1,207,741
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,818 $800 $5,818
71,832
kWh
-
03 2.2511: Insulate bare equipment $2,108 $155 - $2,108
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $23,109 $11,160 - $23,109
-
MMBtu
05 2.7135: Install occupancy sensors $2,884 $833 $2,884
35,609
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $292,552 $333,015 $292,552
3,611,748
kWh
-
07 2.6211: Conserve energy by efficient use of vending machines $357 $1,608 $357
4,402
kWh
-
TOTAL RECOMMENDED $424,655 $347,571 $399,438
4,931,332
kWh
$25,217
-
MMBtu
TOTAL IMPLEMENTED $398,662 $335,578 $396,554
4,895,723
kWh
$2,108
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs