ITAC Assessment: SU0231
ITAC logo
ITAC Assessment: SU0231
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 361,000
ft2
Annual Production 7,300,000
units
Production Hrs. Annual 7,496
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $428,757 7,573,500
kWh
Electricity Demand $141,043 18,145
kW-mo/yr
Electricity Fees $14,432 -
Natural Gas $521,148 540,747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,772

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $11,122 - $8,028
140,844
kWh
$3,094
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,090 - $3,305
57,989
kWh
$785
-
kW-mo/yr
-
03 2.4314: Use synthetic lubricant $1,337 - $1,073
18,815
kWh
$264
-
kW-mo/yr
-
04 2.1232: Keep boiler tubes clean $8,242 $1,800 - - $8,242
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,758 $823 $2,198
38,566
kWh
$560
-
kW-mo/yr
-
06 2.2414: Use waste heat from hot flue gases to preheat $26,335 $19,002 - - $26,335
-
MMBtu
07 2.6211: Conserve energy by efficient use of vending machines $256 $755 $217
3,811
kWh
$39
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $89 $266 $50
876
kWh
$39
-
kW-mo/yr
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,405 $12,425 $2,457
43,109
kWh
$948
-
kW-mo/yr
-
TOTAL RECOMMENDED $57,634 $35,071 $17,328
304,010
kWh
$5,729
-
kW-mo/yr
$34,577
-
MMBtu
TOTAL IMPLEMENTED $16,772 $3,644 $6,843
120,057
kWh
$1,687
-
kW-mo/yr
$8,242
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs