ITAC Assessment: SD0138
ITAC logo
ITAC Assessment: SD0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Polyethylene and Textile Bags
NAICS
n/a
SIC 2393: Textile Bags
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 375,000
ft2
Annual Production 44,000,000
lb
Production Hrs. Annual 8,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,483 3,695,487
kWh
Electricity Demand $184,583 10,898
kW-mo/yr
Electricity Fees $396,066 -
Natural Gas $23,279 3,151
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,032 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $11,552 $14,760 $11,552
133,060
kWh
- - -
02 2.3137: Use power during off-peak periods $37,136 - $37,136
85,580
kWh
- - -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $1,627 $1,495 $1,627
20,809
kWh
- - -
04 2.2511: Insulate bare equipment $1,130 $284 $1,130
21,688
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,848 $13,338 $10,848
91,735
kWh
- - -
06 2.7144: Install spectral reflectors / delamp $18,160 $15,165 $18,160
158,558
kWh
- - -
07 2.7135: Install occupancy sensors $2,449 $1,600 $2,449
18,464
kWh
- - -
08 3.8141: Regenerate cleaning solvent on-site and reuse $18,430 $7,200 - $18,430
-
gal
- -
09 3.5311: Recover and reuse waste material $3,500 - - - $3,500
-
lb
-
10 3.5311: Recover and reuse waste material $1,200 $500 - - - $1,200
TOTAL RECOMMENDED $106,032 $54,342 $82,902
529,894
kWh
$18,430
-
gal
$3,500
-
lb
$1,200
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs