ITAC Assessment: SU0225
ITAC logo
ITAC Assessment: SU0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Bread, roll, donut, muffin, bagel
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 177,000
ft2
Annual Production 57,083,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $726,555 8,971,200
kWh
Electricity Demand $259,384 20,440
kW-mo/yr
Electricity Fees $15,595 -
Natural Gas $320,958 36,644
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $132,695 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $116,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $35,891 - - - - - $35,891 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $16,498 - $13,580
167,666
kWh
$2,918
-
kW-mo/yr
- - - -
03 2.4314: Use synthetic lubricant $12,425 - $9,849
121,590
kWh
$2,576
-
kW-mo/yr
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,730 - $3,804
46,960
kWh
$926
-
kW-mo/yr
- - - -
05 2.2136: Install / repair insulation on steam lines $23,287 $1,708 - - - $23,287
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,994 $1,058 $7,408
91,454
kWh
$1,586
-
kW-mo/yr
- - - -
07 2.2136: Install / repair insulation on steam lines $3,373 $250 - - - $3,373
-
MMBtu
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $606 $653 $230
2,838
kWh
$51
-
kW-mo/yr
- - $216 $109
09 2.7135: Install occupancy sensors $471 $532 $471
5,816
kWh
- - - - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,864 $20,100 $13,235
163,388
kWh
$3,629
-
kW-mo/yr
- - - -
11 2.3212: Optimize plant power factor $9,250 $12,757 - - $9,250 - - -
12 2.6211: Conserve energy by efficient use of vending machines $306 $515 $255
3,154
kWh
$51
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $132,695 $37,573 $48,832
602,866
kWh
$11,737
-
kW-mo/yr
$9,250 $26,660
-
MMBtu
$36,107 $109
TOTAL IMPLEMENTED $116,197 $37,573 $35,252
435,200
kWh
$8,819
-
kW-mo/yr
$9,250 $26,660
-
MMBtu
$36,107 $109
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs