ITAC Assessment: SU0216
ITAC logo
ITAC Assessment: SU0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Steel Windows and Doors
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 200,831
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,515 2,746,925
kWh
Electricity Demand $35,832 12,055
kW-mo/yr
Electricity Fees $7,771 -
Natural Gas $61,571 49,776
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,365

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4321: Upgrade obsolete equipment $3,046 - $2,455
66,360
kWh
$591
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $103 - $76
2,054
kWh
$27
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $580 $294 $473
12,784
kWh
$107
-
kW-mo/yr
-
04 2.4314: Use synthetic lubricant $193 $300 $140
3,796
kWh
$53
-
kW-mo/yr
-
05 4.431: Train operators for maximum operating efficiency $60,060 $134,400 - - $60,060
06 2.7142: Utilize higher efficiency lamps and/or ballasts $416 $981 $104
2,804
kWh
$12
-
kW-mo/yr
$300
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,140 $3,550 $831
22,464
kWh
$309
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $5,013 $17,360 $4,095
110,682
kWh
$918
-
kW-mo/yr
-
09 2.6211: Conserve energy by efficient use of vending machines $389 $1,520 $350
9,461
kWh
$39
-
kW-mo/yr
-
TOTAL RECOMMENDED $70,940 $158,405 $8,524
230,405
kWh
$2,056
-
kW-mo/yr
$60,360
TOTAL IMPLEMENTED $66,365 $153,335 $4,888
132,120
kWh
$1,117
-
kW-mo/yr
$60,360
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs