ITAC Assessment: SU0210
ITAC logo
ITAC Assessment: SU0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product High Temperature Textiles
NAICS 313210: Broadwoven Fabric Mills
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 96,200
ft2
Annual Production 900,000
pieces
Production Hrs. Annual 4,238
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,914 1,594,506
kWh
Electricity Demand $66,050 6,332
kW-mo/yr
Electricity Fees $(-44,959.0) -
Natural Gas $78,410 8,622
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,928

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,587 - $1,961
21,317
kWh
$626
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,063 - $1,416
15,390
kWh
$647
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $328 $143 $224
2,430
kWh
$104
-
kW-mo/yr
-
04 2.4314: Use synthetic lubricant $1,943 $1,000 $1,474
16,020
kWh
$469
-
kW-mo/yr
-
05 2.2442: Preheat combustion air with waste heat $28,070 $35,100 - - $28,070
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,715 $11,225 $4,328
47,042
kWh
$1,387
-
kW-mo/yr
-
TOTAL RECOMMENDED $40,706 $47,468 $9,403
102,199
kWh
$3,233
-
kW-mo/yr
$28,070
-
MMBtu
TOTAL IMPLEMENTED $32,928 $36,243 $3,659
39,767
kWh
$1,199
-
kW-mo/yr
$28,070
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs