Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Turkey Products
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 52,000
ft2
Annual Production 600,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,423 2,168,854
kWh
Electricity Demand $76,685 6,089
kW-mo/yr
Electricity Fees $10,972 -
Fuel Oil #2 $48,219 6,491
MMBtu
Other Gas $9,782 1,253
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $330,823 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $151,457

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Other Gas Savings Personnel Changes Savings
01 2.9121: Install wind powered electric generator $141,258 $1,171,875 $64,081
2,096,364
kWh
$77,177
-
kW-mo/yr
- - - -
02 2.2515: Use optimum thickness insulation $115,419 $348,540 - - - - $115,419
-
MMBtu
-
03 2.2628: Utilize a less expensive cooling method $30,000 $76,518 - - - - - $30,000
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,096 $55,580 $13,096
230,256
kWh
- - - - -
05 2.6121: Reduce hot water temperature to the minimum required $8,721 - - - - $8,721
-
MMBtu
- -
06 2.9121: Install wind powered electric generator $7,910 $10,000 $2,606
37,225
kWh
$914
-
kW-mo/yr
$4,390 - - -
07 2.5194: Redesign process $6,861 $270 $4,444
63,491
kWh
$2,417
-
kW-mo/yr
- - - -
08 2.1233: Analyze flue gas for proper air/fuel ratio $3,485 $700 - - - $3,485
-
MMBtu
- -
09 2.2121: Increase amount of condensate returned $1,293 $955 - - - $1,293
-
MMBtu
- -
10 2.7491: Insulate glazing, walls, ceilings, and roofs $847 $1,744 $619
8,844
kWh
$228
-
kW-mo/yr
- - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $723 $608 $530
7,570
kWh
$193
-
kW-mo/yr
- - - -
12 2.6218: Turn off equipment when not in use $550 - $440
6,290
kWh
$110
-
kW-mo/yr
- - - -
13 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $462 $29 $462
6,605
kWh
- - - - -
14 2.4221: Install compressor air intakes in coolest locations $198 $150 $124
1,772
kWh
$74
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $330,823 $1,666,969 $86,402
2,458,417
kWh
$81,113
-
kW-mo/yr
$4,390 $13,499
-
MMBtu
$115,419
-
MMBtu
$30,000
TOTAL IMPLEMENTED $151,457 $408,426 $19,591
323,056
kWh
$2,948
-
kW-mo/yr
- $13,499
-
MMBtu
$115,419
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Other Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs