Assessment Year | 2003 |
---|---|
Principal Product | Automotive engine blocks and heads |
NAICS | 331524: Aluminum Foundries (except Die-Casting) |
SIC | 3400: |
Sales Range | $100 M to 500M |
# of Employees | 577 |
Plant Area |
862,107
ft2
|
Annual Production | 1,141,283
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $928,893 | 107,448,400 |
kWh
|
$0.009 |
Electricity Demand | $1,170,402 | 185,265 |
kW-mo/yr
|
$6.32 |
Natural Gas | $5,075,568 | 1,173,722 |
MMBtu
|
$4.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,986,551 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,336,834 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.3128: Utilize other methods to remove contaminants | $446,941 | $142,000 |
$(-187.0)
(-9,360)
kWh
|
$105,804
-
MMBtu
|
$389,124
-
lb
|
$(-47,800.0) | |
02 | 2.2437: Recover waste heat from equipment | $158,477 | $3,600 | - |
$158,477
-
MMBtu
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $1,336,834 | $875,536 | - |
$1,336,834
-
MMBtu
|
- | - | |
04 | 2.2511: Insulate bare equipment | $16,605 | $34,047 | - |
$16,605
-
MMBtu
|
- | - | |
05 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $8,492 | $4,200 | - |
$8,492
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,587 | - |
$6,587
765,996
kWh
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $6,473 | $6,375 | - |
$6,473
-
MMBtu
|
- | - | |
08 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $4,145 | $12,781 | - |
$4,145
-
MMBtu
|
- | - | |
09 | 2.2511: Insulate bare equipment | $1,997 | $3,315 | - |
$1,997
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $1,986,551 | $1,081,854 |
$6,400
756,636
kWh
|
$1,638,827
-
MMBtu
|
$389,124
-
lb
|
$(-47,800.0) | ||
TOTAL IMPLEMENTED | $1,336,834 | $875,536 | - |
$1,336,834
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs