Assessment Year | 2003 |
---|---|
Principal Product | sporting fire arms |
NAICS | 332994: Small Arms, Ordnance, and Ordnance Accessories Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 1,091 |
Plant Area |
1,000,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,277,792 | 33,466,882 |
kWh
|
$0.068 |
Other Energy | $857,000 | 186,881 |
MMBtu
|
$4.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $542,774 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $262,657 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Other Energy Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2113: Repair or replace steam traps | $161,780 | $4,536 | - | - |
$161,780
-
MMBtu
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $152,410 | $301,250 |
$152,410
3,628,800
kWh
|
- | - | - | - | |
03 | 3.4111: Use closed cycle process to minimize waste water production | $95,164 | $235,000 | - | - | - |
$95,164
-
gal
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $67,325 | $5,200 |
$67,325
1,602,981
kWh
|
- | - | - | - | |
05 | 2.3212: Optimize plant power factor | $24,189 | $70,275 | - | $24,189 | - | - | - | |
06 | 2.4314: Use synthetic lubricant | $10,573 | $1,000 |
$10,573
251,741
kWh
|
- | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,432 | - |
$10,432
248,382
kWh
|
- | - | - | - | |
08 | 3.5145: Recover and reuse spent acid baths | $7,052 | $6,521 | - | - | - | - |
$7,052
-
gal
|
|
09 | 4.452: Eliminate shift | $5,056 | - |
$5,056
91,690
kWh
|
- | - | - | - | |
10 | 4.821: Pay bills on time to avoid late fees | $4,599 | - | - | $4,599 | - | - | - | |
11 | 4.821: Pay bills on time to avoid late fees | $2,892 | - | - | $2,892 | - | - | - | |
12 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,302 | $3,256 |
$1,302
30,775
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $542,774 | $627,038 |
$247,098
5,854,369
kWh
|
$31,680 |
$161,780
-
MMBtu
|
$95,164
-
gal
|
$7,052
-
gal
|
||
TOTAL IMPLEMENTED | $262,657 | $10,736 |
$93,386
2,194,794
kWh
|
$7,491 |
$161,780
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Other Energy Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs