ITAC Assessment: OR0687
ITAC logo
ITAC Assessment: OR0687
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Automotive Batteries
NAICS 335911: Storage Battery Manufacturing
SIC 3691: Storage Batteries
Sales Range $1
M
to 5
M
# of Employees 250
Plant Area 204,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,608,531 30,255,314
kWh
Electricity Demand $338,695 57,503
kW-mo/yr
Natural Gas $200,099 41,266
MMBtu
Waste Disposal Costs
Water Usage $20,564 10,255
Tgal
TOTAL YEARLY COSTS $2,167,889
RECOMMENDED SAVINGS* $220,341 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings Increase in Production Savings
01 2.1133: Adjust burners for efficient operation $2,090 $600 - - $2,090
-
MMBtu
- - - - - -
02 2.7134: Use photocell controls $2,967 $2,000 $2,001
47,760
kWh
$204
-
kW-mo/yr
- - $232 - $530 - -
03 4.652: Replace existing equipment with more suitable substitutes $205,629 $340,000 $(-13,846.0)
(-328,882)
kWh
- - - $2,550 - $6,000 - $210,925
04 4.131: Modify process to reduce material use/cost $3,195 $5,650 - - $65
-
MMBtu
$3,208 - $3,564 - $(-3,642.0) -
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $6,460 $16,124 $6,460
153,443
kWh
- - - - - - - -
TOTAL RECOMMENDED $220,341 $364,374 $(-5,385.0)
(-127,679)
kWh
$204
-
kW-mo/yr
$2,155
-
MMBtu
$3,208 $2,782 $3,564 $6,530 $(-3,642.0) $210,925
TOTAL IMPLEMENTED - - - - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs