ITAC Assessment: SU0156
ITAC logo
ITAC Assessment: SU0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Metal Finishing
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 32,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,340
hrs
Location (State) New York
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,651 780,000
kWh
Electricity Demand $42,521 3,210
kW-mo/yr
Electricity Fees $13,179 -
Natural Gas $47,036 9,045
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 3.5145: Recover and reuse spent acid baths $21,400 $1,800 - - - $21,400
-
gal
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,081 $8,364 $1,541
22,658
kWh
$1,540
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $2,283 $995 - - $2,283
-
MMBtu
-
04 2.4239: Eliminate or reduce compressed air usage $1,534 $327 $1,534
22,556
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,059 - $542
7,969
kWh
$517
-
kW-mo/yr
- -
TOTAL RECOMMENDED $29,357 $11,486 $3,617
53,183
kWh
$2,057
-
kW-mo/yr
$2,283
-
MMBtu
$21,400
-
gal
TOTAL IMPLEMENTED $29,357 $11,486 $3,617
53,183
kWh
$2,057
-
kW-mo/yr
$2,283
-
MMBtu
$21,400
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs