| Assessment Year | 2002 |
|---|---|
| Principal Product | corrugated shipping cartons |
| NAICS |
n/a
|
| SIC | 2503: |
| Sales Range | $10 M to 50M |
| # of Employees | 117 |
| Plant Area |
167,722
ft2
|
| Annual Production | 685,000
thousand feet
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $408,038 | 4,729,920 |
kWh
|
$0.086 |
| Electricity Demand | $69,001 | 10,631 |
kW-mo/yr
|
$6.49 |
| Natural Gas | $205,776 | 49,259 |
MMBtu
|
$4.18 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,717 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,068 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.4111: Use closed cycle process to minimize waste water production | $7,975 | $2,044 | - | - | - |
$7,975
-
gal
|
|
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,781 | - |
$6,781
78,851
kWh
|
- | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $3,604 | $8,000 | - | - |
$3,604
-
MMBtu
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $3,447 | $932 |
$3,447
47,874
kWh
|
- | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,287 | $60 |
$2,287
31,766
kWh
|
- | - | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,055 | $1,635 |
$1,562
21,696
kWh
|
$493
-
kW-mo/yr
|
- | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $568 | - |
$568
7,884
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $26,717 | $12,671 |
$14,645
188,071
kWh
|
$493
-
kW-mo/yr
|
$3,604
-
MMBtu
|
$7,975
-
gal
|
||
| TOTAL IMPLEMENTED | $9,068 | $60 |
$9,068
110,617
kWh
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs