| Assessment Year | 2010 |
|---|---|
| Principal Product | Silicone Carrbide |
| NAICS | 333314: Optical Instrument and Lens Manufacturing |
| SIC | 3827: Optical Instruments and Lenses |
| Sales Range | $10 M to 50M |
| # of Employees | 69 |
| Plant Area |
56,000
ft2
|
| Annual Production | 12
pieces
|
| Production Hrs. Annual | 3,640
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $233,699 | 1,872,000 |
kWh
|
$0.12 |
| Electricity Demand | $15,524 | 3,833 |
kW-mo/yr
|
$4.05 |
| Natural Gas | $30,466 | 1,967 |
MMBtu
|
$15.49 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $36,176 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $35,346 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $562 | $588 |
$562
3,903
kWh
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $830 | $200 |
$830
6,650
kWh
|
- | - | |
| 03 | 2.7314: Reduce ventilation air | $31,319 | $17,008 |
$19,812
134,263
kWh
|
$11,507
-
MMBtu
|
- | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $707 | $110 |
$707
5,668
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $232 | $260 |
$232
1,863
kWh
|
- | - | |
| 06 | 2.7229: Air condition only space necessary | $2,526 | $11,040 |
$(-1,474.0)
(-11,813)
kWh
|
- | $4,000 | |
| TOTAL RECOMMENDED | $36,176 | $29,206 |
$20,669
140,534
kWh
|
$11,507
-
MMBtu
|
$4,000 | ||
| TOTAL IMPLEMENTED | $35,346 | $29,006 |
$19,839
133,884
kWh
|
$11,507
-
MMBtu
|
$4,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs