ITAC Assessment: SU0134
ITAC logo
ITAC Assessment: SU0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Brake controls and related components for railroad freight cars
NAICS
n/a
SIC 3743: Railroad Equipment
Sales Range $50
M
to 100
M
# of Employees 261
Plant Area 258,000
ft2
Annual Production 12,400
pieces
Production Hrs. Annual 3,840
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $481,747 6,395,540
kWh
Electricity Demand $79,229 14,458
kW-mo/yr
Electricity Fees $8,470 -
Natural Gas $262,636 32,985
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,610 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,161

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings
01 2.2136: Install / repair insulation on steam lines $14,024 $6,613 - - - $14,024
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,420 $89 $11,420
163,142
kWh
- - - -
03 2.3212: Optimize plant power factor $8,470 $23,250 - - $8,470 - -
04 2.2135: Repair and eliminate steam leaks $4,103 $178 - - - $4,103
-
MMBtu
-
05 2.4239: Eliminate or reduce compressed air usage $4,031 $706 $2,707
38,667
kWh
$1,324
-
kW-mo/yr
- - -
06 2.2514: Cover open tanks $2,938 $1,769 - - - $2,938
-
MMBtu
-
07 2.7135: Install occupancy sensors $1,453 $299 $1,134
16,195
kWh
$319
-
kW-mo/yr
- - -
08 2.2135: Repair and eliminate steam leaks $1,197 $22 - - - $614
-
MMBtu
$583
-
Tgal
09 2.2511: Insulate bare equipment $686 $1,106 - - - $686
-
MMBtu
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $288 - $231
3,302
kWh
$57
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $48,610 $34,032 $15,492
221,306
kWh
$1,700
-
kW-mo/yr
$8,470 $22,365
-
MMBtu
$583
-
Tgal
TOTAL IMPLEMENTED $13,161 $388 $12,785
182,639
kWh
$376
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs