ITAC Assessment: CC0033
ITAC logo
ITAC Assessment: CC0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Water Activated Tape
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 84
Plant Area 129,000
ft2
Annual Production 240,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $385,031 6,565,215
kWh
Electricity Demand $135,768 11,258
kW-mo/yr
Natural Gas $436,745 57,867
MMBtu
TOTAL YEARLY COSTS $957,544
RECOMMENDED SAVINGS* $205,794 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $145,181 $230,000 - - $145,181
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $4,410 $15,880 $2,514
42,048
kWh
$1,896
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,026 - $2,371
39,645
kWh
$655
-
kW-mo/yr
-
04 2.2136: Install / repair insulation on steam lines $3,017 $3,056 - - $3,017
-
MMBtu
05 2.9114: Use solar heat to make electricty $50,160 $549,139 $50,160
850,169
kWh
- -
TOTAL RECOMMENDED $205,794 $798,075 $55,045
931,862
kWh
$2,551
-
kW-mo/yr
$148,198
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs