ITAC Assessment: SU0124
ITAC logo
ITAC Assessment: SU0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product solid state controls
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 31,000
ft2
Annual Production 2,313,321
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,581 2,194,240
kWh
Electricity Demand $84,753 6,566
kW-mo/yr
Electricity Fees $10,481 -
Natural Gas $18,707 2,521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,144

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7111: Reduce illumination to minimum necessary levels $3,637 - $2,522
42,048
kWh
$1,115
-
kW-mo/yr
- -
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $27,282 $372,500 $65,580
907,104
kWh
$30,915
-
kW-mo/yr
$(-69,213.0)
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,563 - $1,563
26,057
kWh
- - -
04 2.2511: Insulate bare equipment $55 $45 $55
457
kWh
- - -
05 3.4111: Use closed cycle process to minimize waste water production $2,144 $9,900 - - - $2,144
-
Tgal
TOTAL RECOMMENDED $34,681 $382,445 $69,720
975,666
kWh
$32,030
-
kW-mo/yr
$(-69,213.0)
-
MMBtu
$2,144
-
Tgal
TOTAL IMPLEMENTED $2,144 $9,900 - - - $2,144
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs