ITAC Assessment: OK0449
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Frozen Pizza
NAICS
n/a
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 60,000
ft2
Annual Production 2,800,000
pieces
Production Hrs. Annual 3,744
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,572 6,019,930
kWh
Natural Gas $75,451 22,879
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $5,180 $7,639 $5,180
104,924
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,356 $9,402 $7,356
148,886
kWh
- -
03 2.2511: Insulate bare equipment $326 $212 - $326
-
MMBtu
-
04 2.8121: Apply for tax-free status for energy purchases $7,041 - - - $7,041
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,794 $6,053 $1,794
18,757
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,424 $4,064 $1,424
18,464
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,208 $1,495 $1,208
13,482
kWh
- -
08 2.7135: Install occupancy sensors $858 $70 $858
14,947
kWh
- -
09 2.7134: Use photocell controls $382 $25 $382
6,155
kWh
- -
10 2.2437: Recover waste heat from equipment $20,651 $51,659 - $20,651
-
MMBtu
-
TOTAL RECOMMENDED $46,220 $80,619 $18,202
325,615
kWh
$20,977
-
MMBtu
$7,041
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs