Assessment Year | 2001 |
---|---|
Principal Product | cable system products |
NAICS |
n/a
|
SIC | 3678: Electronic Connectors |
Sales Range | $50 M to 100M |
# of Employees | 500 |
Plant Area |
112,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $189,878 | 4,520,894 |
kWh
|
$0.042 |
Electricity Demand | $109,148 | 9,816 |
kW-mo/yr
|
$11.12 |
Electricity Fees | $25,326 | - |
|
- |
Natural Gas | $20,229 | 5,295 |
MMBtu
|
$3.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,451 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,225 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,244 | - |
$1,244
29,617
kWh
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $28 | - |
$28
655
kWh
|
- | - | - | |
03 | 2.2511: Insulate bare equipment | $1,123 | $213 | - | - | - |
$1,123
-
MMBtu
|
|
04 | 2.7111: Reduce illumination to minimum necessary levels | $1,246 | $662 |
$605
14,400
kWh
|
$641
-
kW-mo/yr
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $3,828 | $30 |
$2,505
59,640
kWh
|
$1,323
-
kW-mo/yr
|
- | - | |
06 | 2.8114: Change rate schedules or other changes in utility service | $982 | - | - | - | $982 | - | |
TOTAL RECOMMENDED | $8,451 | $905 |
$4,382
104,312
kWh
|
$1,964
-
kW-mo/yr
|
$982 |
$1,123
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,225 | $905 |
$3,138
74,695
kWh
|
$1,964
-
kW-mo/yr
|
- |
$1,123
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs