| Assessment Year | 2001 |
|---|---|
| Principal Product | Electroplated and anodized parts |
| NAICS |
n/a
|
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
57,000
ft2
|
| Annual Production | 100,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $308,830 | 5,569,200 |
kWh
|
$0.055 |
| Electricity Demand | $122,655 | 10,410 |
kW-mo/yr
|
$11.78 |
| Electricity Fees | $42,787 | - |
|
- |
| Natural Gas | $297,239 | 70,747 |
MMBtu
|
$4.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $420,806 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,452 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $10,051 | - | - | - | - | - | $10,051 | |
| 02 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $399,407 | $1,400,000 |
$308,830
5,569,294
kWh
|
$122,655
-
kW-mo/yr
|
$42,787 |
$(-74,865.0)
-
MMBtu
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,947 | $2,241 |
$1,947
20,216
kWh
|
- | - | - | - | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,158 | $500 | - | - | - |
$6,158
-
MMBtu
|
- | |
| 05 | 2.3212: Optimize plant power factor | $3,243 | $10,210 |
$3,243
32,229
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $420,806 | $1,412,951 |
$314,020
5,621,739
kWh
|
$122,655
-
kW-mo/yr
|
$42,787 |
$(-68,707.0)
-
MMBtu
|
$10,051 | ||
| TOTAL IMPLEMENTED | $19,452 | $10,710 |
$3,243
32,229
kWh
|
- | - |
$6,158
-
MMBtu
|
$10,051 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs