ITAC Assessment: SU0106
ITAC logo
ITAC Assessment: SU0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Electroplated and anodized parts
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 57,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $308,830 5,569,200
kWh
Electricity Demand $122,655 10,410
kW-mo/yr
Electricity Fees $42,787 -
Natural Gas $297,239 70,747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $420,806 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,452

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $10,051 - - - - - $10,051
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $399,407 $1,400,000 $308,830
5,569,294
kWh
$122,655
-
kW-mo/yr
$42,787 $(-74,865.0)
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,947 $2,241 $1,947
20,216
kWh
- - - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $6,158 $500 - - - $6,158
-
MMBtu
-
05 2.3212: Optimize plant power factor $3,243 $10,210 $3,243
32,229
kWh
- - - -
TOTAL RECOMMENDED $420,806 $1,412,951 $314,020
5,621,739
kWh
$122,655
-
kW-mo/yr
$42,787 $(-68,707.0)
-
MMBtu
$10,051
TOTAL IMPLEMENTED $19,452 $10,710 $3,243
32,229
kWh
- - $6,158
-
MMBtu
$10,051
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs