ITAC Assessment: SU0105
ITAC logo
ITAC Assessment: SU0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Candles
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 49
Plant Area 36,000
ft2
Annual Production 0
units
Production Hrs. Annual 1,920
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,847 364,120
kWh
Electricity Demand $26,700 1,784
kW-mo/yr
Electricity Fees $3,122 -
Natural Gas $43,837 5,745
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $1,365 - - - - $1,365
02 2.2511: Insulate bare equipment $1,285 $38 - - $1,285
-
MMBtu
-
03 2.2511: Insulate bare equipment $993 $123 - - $993
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $258 - $258
4,296
kWh
- - -
05 2.7135: Install occupancy sensors $264 $90 $261
4,355
kWh
$3
-
kW-mo/yr
- -
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $34,064 $380,000 $21,847
364,120
kWh
$22,723
-
kW-mo/yr
$(-10,506.0)
-
MMBtu
-
TOTAL RECOMMENDED $38,229 $380,251 $22,366
372,771
kWh
$22,726
-
kW-mo/yr
$(-8,228.0)
-
MMBtu
$1,365
TOTAL IMPLEMENTED $2,880 $213 $519
8,651
kWh
$3
-
kW-mo/yr
$993
-
MMBtu
$1,365
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs