| Assessment Year | 1986 |
|---|---|
| Principal Product | METAL STAMPINGS |
| NAICS |
n/a
|
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 2,500,000
pieces
|
| Production Hrs. Annual | 2,825
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $136,522 | 711,899 |
kWh
|
$0.19 |
| Natural Gas | $18,536 | 1,969 |
MMBtu
|
$9.41 |
| Fuel Oil #2 | $15,147 | 2,611 |
MMBtu
|
$5.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,693 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,293 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,024 | - |
$2,024
10,551
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,556 | - |
$9,556
49,824
kWh
|
- | - | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,589 | $537 | - |
$678
-
MMBtu
|
$911
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,060 | $1,449 |
$5,060
26,377
kWh
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $337 | $1,167 |
$337
1,758
kWh
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $787 | $1,775 |
$787
4,103
kWh
|
- | - | |
| 07 | 2.7226: Use computer programs to optimize hvac performance | $11,073 | $10,000 |
$11,073
57,737
kWh
|
- | - | |
| 08 | 2.7221: Lower temperature during the winter season and vice-versa | $1,912 | $3,500 | - |
$1,054
-
MMBtu
|
$858
-
MMBtu
|
|
| 09 | 2.7494: Install storm windows and doors | $2,355 | $1,700 | - |
$1,299
-
MMBtu
|
$1,056
-
MMBtu
|
|
| TOTAL RECOMMENDED | $34,693 | $20,128 |
$28,837
150,350
kWh
|
$3,031
-
MMBtu
|
$2,825
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $14,293 | $3,479 |
$12,704
66,236
kWh
|
$678
-
MMBtu
|
$911
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs