Assessment Year | 1986 |
---|---|
Principal Product | STRING INSTRUMENTS |
NAICS |
n/a
|
SIC | 3931: Musical Instruments |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
n/a
|
Annual Production | 7,500
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $160,077 | 2,038,687 |
kWh
|
$0.079 |
Natural Gas | $34,259 | 4,481 |
MMBtu
|
$7.65 |
Fuel Oil #2 | $54,771 | 9,450 |
MMBtu
|
$5.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,932 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,250 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $347 | $102 |
$347
4,396
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $518 | - |
$518
6,741
kWh
|
- | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,096 | $537 | - | - |
$1,096
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,600 | $783 |
$1,600
20,516
kWh
|
- | - | |
05 | 2.7242: Change zone reheat coils to variable air volume boxes | $11,118 | $20,000 |
$6,032
76,788
kWh
|
$5,086
-
MMBtu
|
- | |
06 | 2.6121: Reduce hot water temperature to the minimum required | $289 | - | - |
$289
-
MMBtu
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $2,593 | $8,000 |
$2,593
33,118
kWh
|
- | - | |
08 | 2.2437: Recover waste heat from equipment | $2,371 | $4,000 | - | - |
$2,371
-
MMBtu
|
|
TOTAL RECOMMENDED | $19,932 | $33,422 |
$11,090
141,559
kWh
|
$5,375
-
MMBtu
|
$3,467
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,250 | $639 |
$865
11,137
kWh
|
$289
-
MMBtu
|
$1,096
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs