ITAC Assessment: ST0059
ITAC logo
ITAC Assessment: ST0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CHEMICAL STABILIZERS
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 18,000,000
lb
Production Hrs. Annual 2,125
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,712 1,002,931
kWh
Natural Gas $68,815 13,392
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,423

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,411 $537 - $2,411
-
MMBtu
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $848 $310 - $848
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $5,706 $12,500 $5,706
53,634
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,863 $997 $3,863
36,342
kWh
-
05 2.7261: Install timers and/or thermostats $3,301 $6,000 - $3,301
-
MMBtu
06 2.4133: Use most efficient type of electric motors $234 $633 $234
2,345
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $156 $293 $156
1,465
kWh
-
TOTAL RECOMMENDED $16,519 $21,270 $9,959
93,786
kWh
$6,560
-
MMBtu
TOTAL IMPLEMENTED $10,423 $7,844 $3,863
36,342
kWh
$6,560
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs