Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product WOVEN LABELS
NAICS
n/a
SIC 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area
n/a
Annual Production 8,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,245 1,674,678
kWh
Natural Gas $5,424 781
MMBtu
Fuel Oil #2 $12,689 1,952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,577 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,804

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,108 $6,443 $8,108
92,907
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $535 $535 - - $535
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,761 $1,469 $1,761
20,223
kWh
- -
04 2.6121: Reduce hot water temperature to the minimum required $161 - - $161
-
MMBtu
-
05 2.3191: Use demand controller or load shedder $3,012 $6,000 $3,012
-
kWh
- -
TOTAL RECOMMENDED $13,577 $14,447 $12,881
113,130
kWh
$161
-
MMBtu
$535
-
MMBtu
TOTAL IMPLEMENTED $8,804 $6,978 $8,108
92,907
kWh
$161
-
MMBtu
$535
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs