Assessment Year | 1986 |
---|---|
Principal Product | POWER SUPPLIES |
NAICS |
n/a
|
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 1,950
pieces
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $145,827 | 1,386,870 |
kWh
|
$0.11 |
Natural Gas | $7,712 | 1,171 |
MMBtu
|
$6.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,484 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,078 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $62 | - |
$62
586
kWh
|
- | |
02 | 2.6218: Turn off equipment when not in use | $339 | - |
$339
3,224
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $92 | $40 |
$92
879
kWh
|
- | |
04 | 2.6121: Reduce hot water temperature to the minimum required | $1,602 | - |
$1,602
15,240
kWh
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,847 | $800 |
$2,526
24,033
kWh
|
$(-679.0)
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,207 | $4,638 |
$5,207
49,531
kWh
|
- | |
07 | 2.7224: Reduce space conditioning during non-working hours | $3,440 | - | - |
$3,440
-
MMBtu
|
|
08 | 2.7226: Use computer programs to optimize hvac performance | $8,534 | $10,000 |
$8,534
81,184
kWh
|
- | |
09 | 2.7494: Install storm windows and doors | $2,273 | $1,000 |
$2,003
19,050
kWh
|
$270
-
MMBtu
|
|
10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,088 | $1,200 |
$5,577
53,048
kWh
|
$(-1,489.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $27,484 | $17,678 |
$25,942
246,775
kWh
|
$1,542
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,078 | $4,678 |
$5,638
53,634
kWh
|
$3,440
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs