| Assessment Year | 1985 |
|---|---|
| Principal Product | POWDERED METALS |
| NAICS |
n/a
|
| SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 3,000
ton
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $726,749 | 10,502,052 |
kWh
|
$0.069 |
| Natural Gas | $161,917 | 27,485 |
MMBtu
|
$5.89 |
| LPG | $266,447 | 47,998 |
MMBtu
|
$5.55 |
| Fuel Oil #2 | $37,488 | 6,580 |
MMBtu
|
$5.70 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,195 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $292 | $60 | - |
$208
-
MMBtu
|
$84
-
MMBtu
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,867 | $40 |
$6,867
99,355
kWh
|
- | - | - | |
| 03 | 2.6121: Reduce hot water temperature to the minimum required | $607 | - |
$377
5,569
kWh
|
$230
-
MMBtu
|
- | - | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $706 | $1,700 |
$1,109
16,120
kWh
|
$(-403.0)
-
MMBtu
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $29,188 | $16,200 | - | - | - |
$29,188
-
MMBtu
|
|
| 06 | 2.1122: Re-size charging openings or add a movable door on equipment | $6,181 | - |
$7,605
109,906
kWh
|
- | - |
$(-1,424.0)
-
MMBtu
|
|
| 07 | 2.4322: Use or replace with energy efficient substitutes | $1,096 | $400 |
$(-76.0)
(-1,172)
kWh
|
$1,172
-
MMBtu
|
- | - | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $712 | $537 | - | - | - |
$712
-
MMBtu
|
|
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,391 | $682 |
$1,391
20,223
kWh
|
- | - | - | |
| 10 | 2.1122: Re-size charging openings or add a movable door on equipment | $155 | $450 | - |
$442
-
MMBtu
|
- |
$(-287.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $47,195 | $20,069 |
$17,273
250,001
kWh
|
$1,649
-
MMBtu
|
$84
-
MMBtu
|
$28,189
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs