ITAC Assessment: SF0442
ITAC logo
ITAC Assessment: SF0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Peptides
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 44
Plant Area 130,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,715 880,560
kWh
Electricity Demand $47,304 2,003
kW-mo/yr
Natural Gas $7,618 775
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $2,021 - $489
5,541
kWh
- $1,532
-
MMBtu
02 2.6218: Turn off equipment when not in use $4,864 $2,722 $4,607
52,200
kWh
- $257
-
MMBtu
03 2.7131: Add area lighting switches $409 $252 $179
2,023
kWh
$230
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,082 $12,459 $1,299
14,721
kWh
$1,783
-
kW-mo/yr
-
05 2.2621: Modify refrigeration system to operate at a lower pressure $231 $1,559 $169
1,909
kWh
$62
-
kW-mo/yr
-
06 2.9114: Use solar heat to make electricty $14,162 $173,094 $7,563
76,222
kWh
$6,599
-
kW-mo/yr
-
TOTAL RECOMMENDED $24,769 $190,086 $14,306
152,616
kWh
$8,674
-
kW-mo/yr
$1,789
-
MMBtu
TOTAL IMPLEMENTED $10,198 $16,740 $6,564
74,371
kWh
$1,845
-
kW-mo/yr
$1,789
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs