| Assessment Year | 2026 |
|---|---|
| Principal Product | Vegetable research and development |
| NAICS | 111219: Other Vegetable (except Potato) and Melon Farming |
| SIC | 0161: Vegetables and Melons |
| Sales Range | $10 M to 50M |
| # of Employees | 155 |
| Plant Area |
140,000
ft2
|
| Annual Production | 1,000,000
units
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $342,715 | 1,596,772 |
kWh
|
$0.21 |
| Electricity Demand | $202,047 | 4,964 |
kW-mo/yr
|
$40.70 |
| Natural Gas | $249,813 | 11,260 |
MMBtu
|
$22.19 |
| Fuel Oil #1 | $32,728 | 657 |
MMBtu
|
$49.81 |
| TOTAL YEARLY COSTS | $827,303 | |||
| RECOMMENDED SAVINGS* | $268,917 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $215,086 | $487,948 |
$132,546
616,495
kWh
|
$82,540
-
kW-mo/yr
|
- | |
| 02 | 2.2511: Insulate bare equipment | $381 | $571 |
$26
121
kWh
|
- |
$355
-
MMBtu
|
|
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,903 | $882 |
$1,684
7,835
kWh
|
$219
-
kW-mo/yr
|
- | |
| 04 | 2.9114: Use solar heat to make electricty | $35,359 | $207,124 |
$32,918
153,107
kWh
|
$2,441
-
kW-mo/yr
|
- | |
| 05 | 2.2211: Use optimum temperature | $12,605 | - |
$1,105
5,141
kWh
|
- |
$11,500
-
MMBtu
|
|
| 06 | 2.7135: Install occupancy sensors | $3,583 | $1,458 |
$2,043
9,501
kWh
|
$1,540
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $268,917 | $697,983 |
$170,322
792,200
kWh
|
$86,740
-
kW-mo/yr
|
$11,855
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs