ITAC Assessment: SJ0046
ITAC logo
ITAC Assessment: SJ0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Vegetable research and development
NAICS 111219: Other Vegetable (except Potato) and Melon Farming
SIC 0161: Vegetables and Melons
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 140,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $342,715 1,596,772
kWh
Electricity Demand $202,047 4,964
kW-mo/yr
Natural Gas $249,813 11,260
MMBtu
Fuel Oil #1 $32,728 657
MMBtu
TOTAL YEARLY COSTS $827,303
RECOMMENDED SAVINGS* $268,917 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $215,086 $487,948 $132,546
616,495
kWh
$82,540
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $381 $571 $26
121
kWh
- $355
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,903 $882 $1,684
7,835
kWh
$219
-
kW-mo/yr
-
04 2.9114: Use solar heat to make electricty $35,359 $207,124 $32,918
153,107
kWh
$2,441
-
kW-mo/yr
-
05 2.2211: Use optimum temperature $12,605 - $1,105
5,141
kWh
- $11,500
-
MMBtu
06 2.7135: Install occupancy sensors $3,583 $1,458 $2,043
9,501
kWh
$1,540
-
kW-mo/yr
-
TOTAL RECOMMENDED $268,917 $697,983 $170,322
792,200
kWh
$86,740
-
kW-mo/yr
$11,855
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs