| Assessment Year | 2026 |
|---|---|
| Principal Product | Printed circuit boards |
| NAICS | 334412: Bare Printed Circuit Board Manufacturing |
| SIC | 3672: Printed Circuit Boards |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
30,000
ft2
|
| Annual Production | 685,600
units
|
| Production Hrs. Annual | 5,460
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $393,099 | 1,446,450 |
kWh
|
$0.27 |
| Electricity Demand | $101,697 | 4,732 |
kW-mo/yr
|
$21.49 |
| Natural Gas | $1,733 | 82 |
MMBtu
|
$21.13 |
| TOTAL YEARLY COSTS | $496,529 | |||
| RECOMMENDED SAVINGS* | $47,288 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,421 | $9,423 |
$6,139
22,569
kWh
|
$282
-
kW-mo/yr
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,682 | $6,115 |
$5,228
19,219
kWh
|
$454
-
kW-mo/yr
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,893 | $3,239 |
$3,693
13,578
kWh
|
$200
-
kW-mo/yr
|
- | |
| 04 | 2.3141: Use battery storage for demand control | $7,754 | $81,200 |
$(-13.3)
(-49)
kWh
|
$7,767
-
kW-mo/yr
|
- | |
| 05 | 2.8112: Combine utility meters | $14,808 | - | - | - | $14,808 | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $460 | - |
$423
1,554
kWh
|
$37
-
kW-mo/yr
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,270 | - |
$7,604
27,955
kWh
|
$666
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $47,288 | $99,977 |
$23,074
84,826
kWh
|
$9,406
-
kW-mo/yr
|
$14,808 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs