ITAC Assessment: SJ0042
ITAC logo
ITAC Assessment: SJ0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Bonded Carpet Cushion
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $50
M
to 100
M
# of Employees 83
Plant Area 384,634
ft2
Annual Production 800,000
units
Production Hrs. Annual 5,100
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $564,251 4,209,058
kWh
Electricity Demand $836,231 13,590
kW-mo/yr
Natural Gas $127,197 10,121
MMBtu
Other Energy $33,696 1,788
MMBtu
Waste Disposal Costs
Water Usage $54,802 1,536
Tgal
TOTAL YEARLY COSTS $1,616,177
RECOMMENDED SAVINGS* $309,632 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Water Consumption Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,657 $43,400 $12,813
95,625
kWh
$13,844
-
kW-mo/yr
- - -
02 2.2511: Insulate bare equipment $462 $798 - - $462
-
MMBtu
- -
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $258 $1,739 - - $258
-
MMBtu
- -
04 2.1241: Reduce excessive boiler blowdown $1,078 $2,456 - - $113
-
MMBtu
$953
-
gal
$12
-
Tgal
05 2.7135: Install occupancy sensors $19,412 $41,750 $11,167
83,335
kWh
$8,245
-
kW-mo/yr
- - -
06 2.4239: Eliminate or reduce compressed air usage $2,422 $1,167 $2,360
17,612
kWh
$62
-
kW-mo/yr
- - -
07 2.4239: Eliminate or reduce compressed air usage $1,004 - $652
4,868
kWh
$352
-
kW-mo/yr
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,895 - $2,529
18,870
kWh
$1,366
-
kW-mo/yr
- - -
09 2.9114: Use solar heat to make electricty $254,444 $1,522,550 $199,482
1,488,669
kWh
$54,962
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $309,632 $1,613,860 $229,003
1,708,979
kWh
$78,831
-
kW-mo/yr
$833
-
MMBtu
$953
-
gal
$12
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs