Assessment Year | 2024 |
---|---|
Principal Product | Manufacturing Aeorspace, Defense, Semiconductor and Medical Parts |
NAICS | 332811: Metal Heat Treating |
SIC | 3398: Metal Heat Treating |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
27,000
ft2
|
Annual Production | 10,000
units
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $326,768 | 1,357,950 |
kWh
|
$0.24 |
Electricity Demand | $85,526 | 4,569 |
kW-mo/yr
|
$18.72 |
Natural Gas | $4,001 | 174 |
MMBtu
|
$22.99 |
TOTAL YEARLY COSTS | $416,295 | |||
RECOMMENDED SAVINGS* | $124,202 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $67,207 | $14,360 |
$67,207
278,869
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $991 | - |
$991
4,111
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,130 | $16,703 |
$3,393
14,080
kWh
|
$737
-
kW-mo/yr
|
|
04 | 2.6218: Turn off equipment when not in use | $6,936 | - |
$6,936
28,780
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $475 | $125 |
$390
1,619
kWh
|
$85
-
kW-mo/yr
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $31,290 | - |
$29,493
122,379
kWh
|
$1,797
-
kW-mo/yr
|
|
07 | 2.4131: Size electric motors for peak operating efficiency | $1,211 | $989 |
$1,211
5,025
kWh
|
- | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $522 | $2,897 |
$522
2,166
kWh
|
- | |
09 | 2.7135: Install occupancy sensors | $182 | $160 |
$182
757
kWh
|
- | |
10 | 2.6212: Turn off equipment during breaks, reduce operating time | $11,258 | - |
$11,258
46,715
kWh
|
- | |
TOTAL RECOMMENDED | $124,202 | $35,234 |
$121,583
504,501
kWh
|
$2,619
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs