ITAC Assessment: SJ0025
ITAC logo
ITAC Assessment: SJ0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Manufacturing Aeorspace, Defense, Semiconductor and Medical Parts
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 27,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 4,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $326,768 1,357,950
kWh
Electricity Demand $85,526 4,569
kW-mo/yr
Natural Gas $4,001 174
MMBtu
TOTAL YEARLY COSTS $416,295
RECOMMENDED SAVINGS* $124,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $67,207 $14,360 $67,207
278,869
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $991 - $991
4,111
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,130 $16,703 $3,393
14,080
kWh
$737
-
kW-mo/yr
04 2.6218: Turn off equipment when not in use $6,936 - $6,936
28,780
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $475 $125 $390
1,619
kWh
$85
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,290 - $29,493
122,379
kWh
$1,797
-
kW-mo/yr
07 2.4131: Size electric motors for peak operating efficiency $1,211 $989 $1,211
5,025
kWh
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $522 $2,897 $522
2,166
kWh
-
09 2.7135: Install occupancy sensors $182 $160 $182
757
kWh
-
10 2.6212: Turn off equipment during breaks, reduce operating time $11,258 - $11,258
46,715
kWh
-
TOTAL RECOMMENDED $124,202 $35,234 $121,583
504,501
kWh
$2,619
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs