Assessment Year | 2024 |
---|---|
Principal Product | Cast ison and steel parts |
NAICS | 331513: Steel Foundries (except Investment) |
SIC | 3325: Steel Foundries, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
70,000
ft2
|
Annual Production | 2,000,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $166,213 | 1,584,152 |
kWh
|
$0.10 |
Electricity Demand | $79,988 | 22,576 |
kW-mo/yr
|
$3.54 |
Natural Gas | $90,375 | 5,453 |
MMBtu
|
$16.57 |
TOTAL YEARLY COSTS | $336,576 | |||
RECOMMENDED SAVINGS* | $39,557 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,066 | $11,290 |
$5,914
56,367
kWh
|
$1,152
-
kW-mo/yr
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,985 | $11,774 |
$2,498
23,804
kWh
|
$487
-
kW-mo/yr
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,691 | $4,253 |
$2,527
24,086
kWh
|
$164
-
kW-mo/yr
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,283 | $4,037 |
$714
6,808
kWh
|
$569
-
kW-mo/yr
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,414 | $69 |
$1,414
13,475
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,365 | $3,762 |
$1,142
10,887
kWh
|
$223
-
kW-mo/yr
|
|
07 | 2.9114: Use solar heat to make electricty | $22,753 | $159,594 |
$22,753
216,691
kWh
|
- | |
TOTAL RECOMMENDED | $39,557 | $194,779 |
$36,962
352,118
kWh
|
$2,595
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs