Assessment Year | 2024 |
---|---|
Principal Product | Wood shavings |
NAICS | 321219: Reconstituted Wood Product Manufacturing |
SIC | 2493: Reconstituted Wood Products |
Sales Range | $5 M to 10M |
# of Employees | 24 |
Plant Area |
290,000
ft2
|
Annual Production | 19,000
ton
|
Production Hrs. Annual | 7,800
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $472,282 | 2,221,485 |
kWh
|
$0.21 |
Electricity Demand | $102,896 | 5,526 |
kW-mo/yr
|
$18.62 |
Other Gas | $14,207 | 528 |
MMBtu
|
$26.92 |
Other Energy | $88,846 | 2,862 |
MMBtu
|
$31.04 |
TOTAL YEARLY COSTS | $678,231 | |||
RECOMMENDED SAVINGS* | $478,743 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,050 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $427,760 | $693,530 |
$392,934
1,848,253
kWh
|
$34,826
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $19,454 | $17,634 |
$16,294
76,642
kWh
|
$3,160
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,864 | $4,784 |
$2,601
12,233
kWh
|
$263
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,211 | $1,240 | - |
$1,211
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,050 | $51 |
$2,050
9,640
kWh
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,018 | - |
$1,656
7,788
kWh
|
$362
-
kW-mo/yr
|
- | |
07 | 2.2511: Insulate bare equipment | $22,822 | $3,080 | - | - | $22,822 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $564 | $336 |
$564
2,652
kWh
|
- | - | |
TOTAL RECOMMENDED | $478,743 | $720,655 |
$416,099
1,957,208
kWh
|
$39,822
-
kW-mo/yr
|
$22,822 | ||
TOTAL IMPLEMENTED | $2,050 | $51 |
$2,050
9,640
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs