| Assessment Year | 2024 |
|---|---|
| Principal Product | Wood shavings |
| NAICS | 321219: Reconstituted Wood Product Manufacturing |
| SIC | 2493: Reconstituted Wood Products |
| Sales Range | $5 M to 10M |
| # of Employees | 24 |
| Plant Area |
290,000
ft2
|
| Annual Production | 19,000
ton
|
| Production Hrs. Annual | 7,800
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $472,282 | 2,221,485 |
kWh
|
$0.21 |
| Electricity Demand | $102,896 | 5,526 |
kW-mo/yr
|
$18.62 |
| Other Gas | $14,207 | 528 |
MMBtu
|
$26.92 |
| Other Energy | $88,846 | 2,862 |
MMBtu
|
$31.04 |
| TOTAL YEARLY COSTS | $678,231 | |||
| RECOMMENDED SAVINGS* | $478,743 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,050 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $427,760 | $693,530 |
$392,934
1,848,253
kWh
|
$34,826
-
kW-mo/yr
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $19,454 | $17,634 |
$16,294
76,642
kWh
|
$3,160
-
kW-mo/yr
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,864 | $4,784 |
$2,601
12,233
kWh
|
$263
-
kW-mo/yr
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,211 | $1,240 | - |
$1,211
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,050 | $51 |
$2,050
9,640
kWh
|
- | - | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $2,018 | - |
$1,656
7,788
kWh
|
$362
-
kW-mo/yr
|
- | |
| 07 | 2.2511: Insulate bare equipment | $22,822 | $3,080 | - | - | $22,822 | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $564 | $336 |
$564
2,652
kWh
|
- | - | |
| TOTAL RECOMMENDED | $478,743 | $720,655 |
$416,099
1,957,208
kWh
|
$39,822
-
kW-mo/yr
|
$22,822 | ||
| TOTAL IMPLEMENTED | $2,050 | $51 |
$2,050
9,640
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs