Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Wood shavings
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $5
M
to 10
M
# of Employees 24
Plant Area 290,000
ft2
Annual Production 19,000
ton
Production Hrs. Annual 7,800
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $472,282 2,221,485
kWh
Electricity Demand $102,896 5,526
kW-mo/yr
Other Gas $14,207 528
MMBtu
Other Energy $88,846 2,862
MMBtu
TOTAL YEARLY COSTS $678,231
RECOMMENDED SAVINGS* $478,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,050

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Increase in Production Savings
01 2.9114: Use solar heat to make electricty $427,760 $693,530 $392,934
1,848,253
kWh
$34,826
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,454 $17,634 $16,294
76,642
kWh
$3,160
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,864 $4,784 $2,601
12,233
kWh
$263
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,211 $1,240 - $1,211
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,050 $51 $2,050
9,640
kWh
- -
06 2.4239: Eliminate or reduce compressed air usage $2,018 - $1,656
7,788
kWh
$362
-
kW-mo/yr
-
07 2.2511: Insulate bare equipment $22,822 $3,080 - - $22,822
08 2.7142: Utilize higher efficiency lamps and/or ballasts $564 $336 $564
2,652
kWh
- -
TOTAL RECOMMENDED $478,743 $720,655 $416,099
1,957,208
kWh
$39,822
-
kW-mo/yr
$22,822
TOTAL IMPLEMENTED $2,050 $51 $2,050
9,640
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs