Assessment Year | 2024 |
---|---|
Principal Product | Tortilla, Tortilla Chips |
NAICS | 311830: Tortilla Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 23 |
Plant Area |
35,000
ft2
|
Annual Production | 2,000,000
units
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,185 | 285,712 |
kWh
|
$0.22 |
Electricity Demand | $31,377 | 1,782 |
kW-mo/yr
|
$17.61 |
Natural Gas | $74,719 | 4,094 |
MMBtu
|
$18.25 |
TOTAL YEARLY COSTS | $170,281 | |||
RECOMMENDED SAVINGS* | $77,090 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $47,814 | $107,262 |
$41,268
183,990
kWh
|
$6,546
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,372 | $104 |
$2,372
10,542
kWh
|
- | - | - | |
03 | 2.6127: Maintain air filters by cleaning or replacement | $28 | $235 |
$7
33
kWh
|
$21
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,556 | $4,600 |
$865
3,851
kWh
|
$2,691
-
kW-mo/yr
|
- | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $733 | - |
$489
2,174
kWh
|
$244
-
kW-mo/yr
|
- | - | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $20,579 | - | - | - | - |
$20,579
-
MMBtu
|
|
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $155 | $22 |
$155
689
kWh
|
- | - | - | |
08 | 2.2511: Insulate bare equipment | $1,399 | $1,473 | - | - | - |
$1,399
-
MMBtu
|
|
09 | 2.8112: Combine utility meters | $454 | - | - | - | $454 | - | |
TOTAL RECOMMENDED | $77,090 | $113,696 |
$45,156
201,279
kWh
|
$9,502
-
kW-mo/yr
|
$454 |
$21,978
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs