ITAC Assessment: SJ0008
ITAC logo
ITAC Assessment: SJ0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product battery electrolytes
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 8
Plant Area 32,000
ft2
Annual Production 50
ton
Production Hrs. Annual 2,346
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,999 430,259
kWh
Electricity Demand $39,349 990
kW-mo/yr
Natural Gas $10,557 478
MMBtu
TOTAL YEARLY COSTS $138,905
RECOMMENDED SAVINGS* $14,109 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $13,195 $77,365 $13,195
80,952
kWh
-
02 2.6218: Turn off equipment when not in use $365 - $365
2,237
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $80 - $80
488
kWh
-
04 2.4133: Use most efficient type of electric motors $126 $436 $56
342
kWh
$70
-
kW-mo/yr
05 2.2511: Insulate bare equipment $265 $344 $265
1,623
kWh
-
06 2.7135: Install occupancy sensors $78 $177 $78
245
kWh
-
TOTAL RECOMMENDED $14,109 $78,322 $14,039
85,887
kWh
$70
-
kW-mo/yr
TOTAL IMPLEMENTED $630 $344 $630
3,860
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs