ITAC Assessment: SJ0006
ITAC logo
ITAC Assessment: SJ0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Roofing; Pond Liners; Custom Products
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 120,000
ft2
Annual Production 9,598,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $389,107 2,529,775
kWh
Electricity Demand $362,519 9,168
kW-mo/yr
Electricity Fees $(-316,732.0) -
Natural Gas $97,675 12,439
MMBtu
TOTAL YEARLY COSTS $532,569
RECOMMENDED SAVINGS* $165,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $132,467 $665,395 $119,928
779,718
kWh
$12,539
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,014 $7,324 $2,147
13,956
kWh
$2,867
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $798 $2,977 $798
5,188
kWh
- -
04 2.2437: Recover waste heat from equipment $1,078 $7,298 - - $1,078
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,647 $23,000 $14,647
95,226
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,713 $4,600 $2,713
17,637
kWh
- -
07 2.2441: Preheat boiler makeup water with waste process heat $8,791 $39,456 - - $8,791
-
MMBtu
08 2.2136: Install / repair insulation on steam lines $332 $1,762 - - $332
-
MMBtu
TOTAL RECOMMENDED $165,840 $751,812 $140,233
911,725
kWh
$15,406
-
kW-mo/yr
$10,201
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs