Assessment Year | 2000 |
---|---|
Principal Product | bearings |
NAICS |
n/a
|
SIC | 3562: Ball and Roller Bearings |
Sales Range | $10 M to 50M |
# of Employees | 379 |
Plant Area |
555,000
ft2
|
Annual Production | 1,930,500
pieces
|
Production Hrs. Annual | 7,020
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,229,145 | 24,974,209 |
kWh
|
$0.049 |
Electricity Demand | $467,357 | 51,665 |
kW-mo/yr
|
$9.05 |
Electricity Fees | $25,554 | - |
|
- |
Natural Gas | $248,068 | 55,497 |
MMBtu
|
$4.47 |
Fuel Oil #6 | $186,876 | 56,990 |
MMBtu
|
$3.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $130,715 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $63,825 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $63,120 | $282,000 |
$81,470
1,638,335
kWh
|
$21,150
-
kW-mo/yr
|
$(-39,500.0)
-
MMBtu
|
- | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,190 | $10,000 |
$1,680
35,170
kWh
|
- | - |
$(-490.0)
-
MMBtu
|
- | |
03 | 3.4114: Replace city water with recycled water via cooling tower | $4,330 | $8,000 |
$(-70.0)
(-1,465)
kWh
|
- | - | - |
$4,400
-
Tgal
|
|
04 | 2.7229: Air condition only space necessary | $10,600 | $5,000 | - | - | - |
$10,600
-
MMBtu
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,290 | $9,000 |
$1,290
26,964
kWh
|
- | - | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,290 | $6,500 |
$1,290
25,791
kWh
|
- | - | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,450 | $27,000 |
$21,450
448,417
kWh
|
- | - | - | - | |
08 | 2.2625: Chill water to the highest temperature possible | $8,620 | $2,000 |
$8,620
177,022
kWh
|
- | - | - | - | |
09 | 2.2623: Minimize condenser cooling water temperature | $930 | - |
$930
19,050
kWh
|
- | - | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,660 | $5,000 |
$3,680
75,615
kWh
|
$980
-
kW-mo/yr
|
- | - | - | |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,020 | - |
$1,020
20,516
kWh
|
- | - | - | - | |
12 | 2.7135: Install occupancy sensors | $12,215 | $1,000 |
$12,215
247,655
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $130,715 | $355,500 |
$133,575
2,713,070
kWh
|
$22,130
-
kW-mo/yr
|
$(-39,500.0)
-
MMBtu
|
$10,110
-
MMBtu
|
$4,400
-
Tgal
|
||
TOTAL IMPLEMENTED | $63,825 | $48,000 |
$47,845
986,810
kWh
|
$980
-
kW-mo/yr
|
- |
$10,600
-
MMBtu
|
$4,400
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs