ITAC Assessment: SF0641
ITAC logo
ITAC Assessment: SF0641
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Still and Sparkling Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $100
M
to 500
M
# of Employees 106
Plant Area 133,000
ft2
Annual Production 2,200,000
units
Production Hrs. Annual 4,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $283,537 1,975,920
kWh
Electricity Demand $68,996 7,290
kW-mo/yr
Natural Gas $33,548 1,786
MMBtu
TOTAL YEARLY COSTS $386,081
RECOMMENDED SAVINGS* $290,546 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,784 - $2,744
19,123
kWh
- - $(-960.0) -
02 2.4239: Eliminate or reduce compressed air usage $3,689 - $3,689
25,714
kWh
- - - -
03 2.6212: Turn off equipment during breaks, reduce operating time $1,400 - $1,400
9,759
kWh
- - - -
04 2.7224: Reduce space conditioning during non-working hours $14,638 $2,905 $14,638
102,007
kWh
- - - -
05 2.4239: Eliminate or reduce compressed air usage $1,527 $360 $1,275
8,888
kWh
$252
-
kW-mo/yr
- - -
06 2.2511: Insulate bare equipment $4,098 $2,733 - - $4,098
-
MMBtu
- -
07 2.2691: Shut off cooling if cold outside air will cool process $4,469 $6,928 $4,469
31,146
kWh
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,736 $39,305 $10,736
74,821
kWh
- - - -
09 2.9114: Use solar heat to make electricty $205,222 $1,610,673 $205,222
1,430,117
kWh
- - - -
10 4.212: Adopt in-house material generation $42,983 $240,917 - - - - $42,983
TOTAL RECOMMENDED $290,546 $1,903,821 $244,173
1,701,575
kWh
$252
-
kW-mo/yr
$4,098
-
MMBtu
$(-960.0) $42,983
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs