ITAC Assessment: SF0629
ITAC logo
ITAC Assessment: SF0629
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Specialty Chemicals
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 56,200
ft2
Annual Production 37,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,649 1,014,425
kWh
Electricity Demand $55,933 4,792
kW-mo/yr
Natural Gas $55,871 2,585
MMBtu
TOTAL YEARLY COSTS $227,453
RECOMMENDED SAVINGS* $142,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.6218: Turn off equipment when not in use $3,502 - $3,502
30,721
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $942 - $1,620
14,208
kWh
- - $(-678.0) -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,560 $254 $1,368
12,001
kWh
$192
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $6,353 $4,013 - - $6,353
-
MMBtu
- -
05 2.7135: Install occupancy sensors $2,585 $8,372 $1,659
14,522
kWh
- - $151 $775
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,343 $22,807 $4,326
37,951
kWh
$2,380
-
kW-mo/yr
- $73 $(-436.0)
07 2.9114: Use solar heat to make electricty $121,562 $882,352 $121,562
1,014,425
kWh
- - - -
TOTAL RECOMMENDED $142,847 $917,798 $134,037
1,123,828
kWh
$2,572
-
kW-mo/yr
$6,353
-
MMBtu
$(-454.0) $339
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs