ITAC Assessment: SD0580
ITAC logo
ITAC Assessment: SD0580
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Aerospace Components
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 700
Plant Area 200,000
ft2
Annual Production 144,000
units
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,245,656 15,496,147
kWh
Electricity Demand $601,447 32,044
kW-mo/yr
Electricity Fees $25,509 -
Natural Gas $70,152 11,754
MMBtu
TOTAL YEARLY COSTS $1,942,764
RECOMMENDED SAVINGS* $88,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,210

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $49,167 $126,000 $38,979
484,810
kWh
$10,188
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $31,083 $32,660 $22,498
279,831
kWh
$7,355
-
kW-mo/yr
$1,230
03 2.4231: Reduce the pressure of compressed air to the minimum required $7,534 - $7,534
93,702
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $426 $450 $321
3,991
kWh
$105
-
kW-mo/yr
-
TOTAL RECOMMENDED $88,210 $159,110 $69,332
862,334
kWh
$17,648
-
kW-mo/yr
$1,230
TOTAL IMPLEMENTED $88,210 $159,110 $69,332
862,334
kWh
$17,648
-
kW-mo/yr
$1,230
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs