ITAC Assessment: SF0624
ITAC logo
ITAC Assessment: SF0624
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Recycled Plastic Pellets
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 53,060
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 5,850
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $321,419 2,231,677
kWh
Electricity Demand $72,715 7,432
kW-mo/yr
Electricity Fees $4,266 -
Waste Disposal Costs
Water Usage $1,362 73,316
Tgal
Water Disposal $4,157 73,316
Tgal
TOTAL YEARLY COSTS $403,919
RECOMMENDED SAVINGS* $147,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $1,603 - $1,603
10,984
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,414 $1,073 $1,233
8,447
kWh
$169
-
kW-mo/yr
$43 $(-31.0)
03 2.7134: Use photocell controls $509 $718 $339
2,323
kWh
- $13 $157
04 2.2614: Use cooling tower or economizer to replace chiller cooling $14,370 $58,959 $14,370
98,490
kWh
- - -
05 2.9114: Use solar heat to make electricty $130,070 $760,719 $130,070
891,502
kWh
- - -
TOTAL RECOMMENDED $147,966 $821,469 $147,615
1,011,746
kWh
$169
-
kW-mo/yr
$56 $126
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs