ITAC Assessment: SF0615
ITAC logo
ITAC Assessment: SF0615
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Wood cabinets
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $5
M
to 10
M
# of Employees 24
Plant Area 55,426
ft2
Annual Production 5,000
units
Production Hrs. Annual 2,448
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,532 261,734
kWh
Electricity Demand $26,779 1,468
kW-mo/yr
Electricity Fees $2,448 -
LPG $15,425 201
MMBtu
TOTAL YEARLY COSTS $104,184
RECOMMENDED SAVINGS* $20,669 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,570 - $4,450
19,556
kWh
- $(-880.0) -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,843 $2,120 $1,843
8,103
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $941 $1,884 $695
3,056
kWh
$274
-
kW-mo/yr
$11 $(-39.0)
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,315 $55,046 $14,315
62,923
kWh
- - -
TOTAL RECOMMENDED $20,669 $59,050 $21,303
93,638
kWh
$274
-
kW-mo/yr
$(-869.0) $(-39.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs