ITAC Assessment: SF0603
ITAC logo
ITAC Assessment: SF0603
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Concrete Products
NAICS 327331: Concrete Block and Brick Manufacturing
SIC 3271: Concrete Block and Brick
Sales Range $50
M
to 100
M
# of Employees 108
Plant Area 973,473
ft2
Annual Production 35,000,000
units
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $731,758 5,334,236
kWh
Electricity Demand $379,856 11,376
kW-mo/yr
Natural Gas $867,081 62,633
MMBtu
Other Gas $231,581 6,700
MMBtu
TOTAL YEARLY COSTS $2,210,276
RECOMMENDED SAVINGS* $619,632 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,936

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $1,450 $120 $1,089
7,917
kWh
$361
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,983 $141 $1,462
10,630
kWh
$521
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,760 $1,440 $7,760
56,441
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,008 $7,651 $4,008
29,153
kWh
- - - -
05 2.7134: Use photocell controls $3,805 $9,018 $3,805
27,673
kWh
- - - -
06 2.2414: Use waste heat from hot flue gases to preheat $31,772 $124,644 - - $31,772
-
MMBtu
- -
07 2.2136: Install / repair insulation on steam lines $608 $2,572 - - $608
-
MMBtu
- -
08 2.1321: Replace fossil fuel equipment with electrical equipment $568,246 $3,565,479 $(-86,575.0)
(-629,635)
kWh
$(-40,080.0)
-
kW-mo/yr
- $231,581
-
MMBtu
$463,320
TOTAL RECOMMENDED $619,632 $3,711,065 $(-68,451.0)
(-497,821)
kWh
$(-39,198.0)
-
kW-mo/yr
$32,380
-
MMBtu
$231,581
-
MMBtu
$463,320
TOTAL IMPLEMENTED $49,936 $145,466 $17,035
123,897
kWh
$521
-
kW-mo/yr
$32,380
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs