ITAC Assessment: SF0602
ITAC logo
ITAC Assessment: SF0602
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Treated Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 17,000,000
ft2
Annual Production 2,555,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,648 956,713
kWh
Electricity Fees $63,767 -
Natural Gas $199,851 17,510
MMBtu
TOTAL YEARLY COSTS $474,266
RECOMMENDED SAVINGS* $98,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.2625: Chill water to the highest temperature possible $632 - $632
2,868
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,182 $1,800 $15,182
68,884
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $8,138 $2,126 $8,138
36,941
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $37,571 $47,276 $37,571
170,546
kWh
-
05 2.4322: Use or replace with energy efficient substitutes $31,205 $105,364 $20,693
93,931
kWh
$10,512
06 2.2622: Replace existing chiller with high efficiency model $6,247 $30,019 $6,247
28,359
kWh
-
TOTAL RECOMMENDED $98,975 $186,585 $88,463
401,529
kWh
$10,512
TOTAL IMPLEMENTED $6,247 $30,019 $6,247
28,359
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs