| Assessment Year | 2023 |
|---|---|
| Principal Product | Treated Water |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $1 M to 5M |
| # of Employees | 45 |
| Plant Area |
17,000,000
ft2
|
| Annual Production | 2,555,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $210,648 | 956,713 |
kWh
|
$0.22 |
| Electricity Fees | $63,767 | - |
|
- |
| Natural Gas | $199,851 | 17,510 |
MMBtu
|
$11.41 |
| TOTAL YEARLY COSTS | $474,266 | |||
| RECOMMENDED SAVINGS* | $98,975 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,247 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2625: Chill water to the highest temperature possible | $632 | - |
$632
2,868
kWh
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,182 | $1,800 |
$15,182
68,884
kWh
|
- | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $8,138 | $2,126 |
$8,138
36,941
kWh
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $37,571 | $47,276 |
$37,571
170,546
kWh
|
- | |
| 05 | 2.4322: Use or replace with energy efficient substitutes | $31,205 | $105,364 |
$20,693
93,931
kWh
|
$10,512 | |
| 06 | 2.2622: Replace existing chiller with high efficiency model | $6,247 | $30,019 |
$6,247
28,359
kWh
|
- | |
| TOTAL RECOMMENDED | $98,975 | $186,585 |
$88,463
401,529
kWh
|
$10,512 | ||
| TOTAL IMPLEMENTED | $6,247 | $30,019 |
$6,247
28,359
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs