ITAC Assessment: SF0595
ITAC logo
ITAC Assessment: SF0595
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Baked Bread and Buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 175,000
ft2
Annual Production 72,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $527,456 6,794,828
kWh
Electricity Demand $233,694 13,140
kW-mo/yr
Natural Gas $752,516 52,297
MMBtu
TOTAL YEARLY COSTS $1,513,666
RECOMMENDED SAVINGS* $73,028 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,721

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.7224: Reduce space conditioning during non-working hours $5,809 $1,487 $859
11,073
kWh
- $4,950
-
MMBtu
- -
02 2.2515: Use optimum thickness insulation $2,174 $1,800 - - $2,174
-
MMBtu
- -
03 2.4235: Remove or close off unneeded compressed air lines $9,134 $7,644 $9,134
117,704
kWh
- - - -
04 2.2447: Heat water with exhaust heat $37,173 $32,818 - - $37,173
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $14,989 $21,654 $9,459
121,894
kWh
$5,192
-
kW-mo/yr
- $460 $(-122.0)
06 2.4239: Eliminate or reduce compressed air usage $2,280 $7,191 $2,280
29,385
kWh
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,469 $5,620 $1,469
18,932
kWh
- - - -
TOTAL RECOMMENDED $73,028 $78,214 $23,201
298,988
kWh
$5,192
-
kW-mo/yr
$44,297
-
MMBtu
$460 $(-122.0)
TOTAL IMPLEMENTED $26,721 $37,752 $14,067
181,284
kWh
$5,192
-
kW-mo/yr
$7,124
-
MMBtu
$460 $(-122.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs