ITAC Assessment: SF0593
ITAC logo
ITAC Assessment: SF0593
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Anodizing, Plating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 24
Plant Area 10,850
ft2
Annual Production 20,000
units
Production Hrs. Annual 2,750
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,180 507,648
kWh
Electricity Demand $16,539 1,893
kW-mo/yr
Natural Gas $54,628 3,302
MMBtu
TOTAL YEARLY COSTS $133,347
RECOMMENDED SAVINGS* $40,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,446

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,621 - $16,621
135,680
kWh
- -
02 2.2514: Cover open tanks $5,939 $1,586 $5,939
48,482
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $303 $85 $230
1,874
kWh
$73
-
kW-mo/yr
-
04 2.7224: Reduce space conditioning during non-working hours $3,351 $1,069 $378
3,090
kWh
- $2,973
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $822 $334 $748
6,103
kWh
$74
-
kW-mo/yr
-
06 2.2515: Use optimum thickness insulation $863 $905 - - $863
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,539 $5,175 $3,539
28,889
kWh
- -
08 2.2622: Replace existing chiller with high efficiency model $2,486 $9,050 $2,255
18,404
kWh
$231
-
kW-mo/yr
-
09 2.9114: Use solar heat to make electricty $6,111 $42,120 $6,111
49,882
kWh
- -
TOTAL RECOMMENDED $40,035 $60,324 $35,821
292,404
kWh
$378
-
kW-mo/yr
$3,836
-
MMBtu
TOTAL IMPLEMENTED $24,446 $11,443 $20,232
165,151
kWh
$378
-
kW-mo/yr
$3,836
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs