Assessment Year | 2022 |
---|---|
Principal Product | Metal Food Cans |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3411: Metal Cans |
Sales Range | $100 M to 500M |
# of Employees | 74 |
Plant Area |
128,000
ft2
|
Annual Production | 495,000,000
pieces
|
Production Hrs. Annual | 4,800
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $333,037 | 3,721,332 |
kWh
|
$0.089 | |
Electricity Demand | $145,497 | 8,888 |
kW-mo/yr
|
$16.37 | |
Natural Gas | $33,428 | 4,142 |
MMBtu
|
$8.07 | |
Waste Disposal Costs | |||||
Water Usage | $5,154 | 1,959 |
Tgal
|
$2.63 | |
TOTAL YEARLY COSTS | $517,116 | ||||
RECOMMENDED SAVINGS* | $84,089 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $71,482 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $342 | - |
$1,542
17,233
kWh
|
- | - | $(-1,200.0) | - | |
02 | 2.4235: Remove or close off unneeded compressed air lines | $30,709 | $4,981 |
$30,709
336,080
kWh
|
- | - | - | - | |
03 | 2.7224: Reduce space conditioning during non-working hours | $5,919 | $1,697 |
$2,882
32,200
kWh
|
- |
$3,037
-
MMBtu
|
- | - | |
04 | 2.4322: Use or replace with energy efficient substitutes | $1,748 | $658 |
$1,748
19,536
kWh
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,646 | $4,708 |
$2,507
28,016
kWh
|
$1,139
-
kW-mo/yr
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,961 | $12,352 |
$6,132
68,517
kWh
|
$2,829
-
kW-mo/yr
|
- | - | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $16,091 | $27,625 |
$16,091
179,789
kWh
|
- | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,673 | $46,439 |
$11,741
131,184
kWh
|
$5,223
-
kW-mo/yr
|
- | $1,065 | $(-1,356.0) | |
TOTAL RECOMMENDED | $84,089 | $98,460 |
$73,352
812,555
kWh
|
$9,191
-
kW-mo/yr
|
$3,037
-
MMBtu
|
$(-135.0) | $(-1,356.0) | ||
TOTAL IMPLEMENTED | $71,482 | $81,400 |
$64,713
716,022
kWh
|
$5,223
-
kW-mo/yr
|
$3,037
-
MMBtu
|
$(-135.0) | $(-1,356.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |