ITAC Assessment: SF0560
ITAC logo
ITAC Assessment: SF0560
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Custom Thin Film Coatings
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 9,000
ft2
Annual Production 5,000
units
Production Hrs. Annual 3,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,505 810,718
kWh
Natural Gas $529 35
MMBtu
Waste Disposal Costs
Water Usage $2,560 128
Tgal
TOTAL YEARLY COSTS $138,594
RECOMMENDED SAVINGS* $51,415 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,489

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,246 $70 $1,246
7,460
kWh
- - -
02 2.2614: Use cooling tower or economizer to replace chiller cooling $16,680 $26,850 $16,680
99,823
kWh
- - -
03 2.7135: Install occupancy sensors $4,726 $14,983 $4,536
27,145
kWh
- $132 $58
04 3.1191: Change procedures / equipment / operating conditions $13,118 $45,851 $(-2,382.0)
(-14,256)
kWh
$15,500
-
gal
- -
05 2.9114: Use solar heat to make electricty $15,645 $78,611 $15,645
93,625
kWh
- - -
TOTAL RECOMMENDED $51,415 $166,365 $35,725
213,797
kWh
$15,500
-
gal
$132 $58
TOTAL IMPLEMENTED $33,489 $139,445 $17,799
106,514
kWh
$15,500
-
gal
$132 $58
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs