Assessment Year | 2020 |
---|---|
Principal Product | Treated Water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
74,000
ft2
|
Annual Production | 292,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $547,436 | 4,609,984 |
kWh
|
$0.12 |
Electricity Demand | $231,815 | 6,409 |
kW-mo/yr
|
$36.17 |
Natural Gas | $8,164 | 1,118 |
MMBtu
|
$7.30 |
TOTAL YEARLY COSTS | $787,414 | |||
RECOMMENDED SAVINGS* | $55,563 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,029 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,636 | $212 |
$1,860
15,664
kWh
|
$776
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,557 | $1,554 |
$3,557
29,954
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,836 | $39,572 |
$14,883
125,326
kWh
|
$10,558
-
kW-mo/yr
|
$1,083 | $312 | |
04 | 2.4322: Use or replace with energy efficient substitutes | $474 | $1,290 |
$474
3,997
kWh
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,278 | $23,119 |
$5,847
49,240
kWh
|
$2,431
-
kW-mo/yr
|
- | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $13,782 | $57,750 |
$9,724
81,884
kWh
|
$4,058
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $55,563 | $123,497 |
$36,345
306,065
kWh
|
$17,823
-
kW-mo/yr
|
$1,083 | $312 | ||
TOTAL IMPLEMENTED | $33,029 | $41,338 |
$20,300
170,944
kWh
|
$11,334
-
kW-mo/yr
|
$1,083 | $312 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs