ITAC Assessment: SF0559
ITAC logo
ITAC Assessment: SF0559
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Treated Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 74,000
ft2
Annual Production 292,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $547,436 4,609,984
kWh
Electricity Demand $231,815 6,409
kW-mo/yr
Natural Gas $8,164 1,118
MMBtu
TOTAL YEARLY COSTS $787,414
RECOMMENDED SAVINGS* $55,563 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,029

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,636 $212 $1,860
15,664
kWh
$776
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,557 $1,554 $3,557
29,954
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $26,836 $39,572 $14,883
125,326
kWh
$10,558
-
kW-mo/yr
$1,083 $312
04 2.4322: Use or replace with energy efficient substitutes $474 $1,290 $474
3,997
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,278 $23,119 $5,847
49,240
kWh
$2,431
-
kW-mo/yr
- -
06 2.4322: Use or replace with energy efficient substitutes $13,782 $57,750 $9,724
81,884
kWh
$4,058
-
kW-mo/yr
- -
TOTAL RECOMMENDED $55,563 $123,497 $36,345
306,065
kWh
$17,823
-
kW-mo/yr
$1,083 $312
TOTAL IMPLEMENTED $33,029 $41,338 $20,300
170,944
kWh
$11,334
-
kW-mo/yr
$1,083 $312
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs