Assessment Year | 2020 |
---|---|
Principal Product | Potato Chips, Corn Chips, and Similar Snacks |
NAICS | 311919: Other Snack Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | greater than $500 M |
# of Employees | 1,000 |
Plant Area |
540,000
ft2
|
Annual Production | 165,924,726
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,829,947 | 27,273,502 |
kWh
|
$0.067 | |
Electricity Demand | $842,282 | 49,752 |
kW-mo/yr
|
$16.93 | |
Electricity Fees | $264,115 | - |
|
- | |
Natural Gas | $3,521,406 | 497,693 |
MMBtu
|
$7.08 | |
Waste Disposal Costs | |||||
Water Usage | $56,000 | 2,800 |
Tgal
|
$20.00 | |
TOTAL YEARLY COSTS | $6,513,750 | ||||
RECOMMENDED SAVINGS* | $162,061 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $118,378 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,941 | - |
$5,781
86,155
kWh
|
- | - | $(-840.0) | |
02 | 2.3321: Use steam pressure reduction to generate power | $98,999 | $34,416 | - | - |
$98,999
-
MMBtu
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,186 | $525 |
$1,186
17,681
kWh
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,252 | $4,542 |
$9,252
137,880
kWh
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,759 | $2,995 |
$4,759
70,928
kWh
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $282 | $379 | - | - |
$282
-
MMBtu
|
- | |
07 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $30,342 | $50,211 | - | - |
$30,342
-
MMBtu
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,149 | $6,701 |
$3,149
46,925
kWh
|
- | - | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $145 | $591 |
$145
2,157
kWh
|
- | - | - | |
10 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $9,006 | $75,000 |
$9,857
146,895
kWh
|
$3,407
-
kW-mo/yr
|
$(-4,258.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $162,061 | $175,360 |
$34,129
508,621
kWh
|
$3,407
-
kW-mo/yr
|
$125,365
-
MMBtu
|
$(-840.0) | ||
TOTAL IMPLEMENTED | $118,378 | $42,923 |
$19,937
297,120
kWh
|
- |
$99,281
-
MMBtu
|
$(-840.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs